COURSE MAINTENANCE EVENTS CALENDAR

Click here for 2011 CALENDAR







Saturday, May 21, 2011

Verticutting Greens


Emmanuel verticutting greens

We verticut greens this past Monday, which helps with thatch control and water infiltration . We then top dressed and worked the sand into the small slits left by the verticutter blades. This also helps smooth out the ball roll as well.

applying light topdressing


Sunday, May 15, 2011

Fan Project Update

Marty and Jr finish digging holes for fan bases
This last week the crew, installed the 4 ground posts for the new fans on #1,#2,#12,and #14. The electrical contractor installed the three new power meter mounts and are waiting on code inspections. Once the inspections are approved, they will start trenching and installing conduit for the wire. Trenching should start Wednesday this next week, along with the power companies being able to run power to the new meters. So be aware of workers on the course not use to golfers and golf balls. We are planning on starting play on the back, on days they are working on the front two holes. As part of this project, the course crew will be repairing the stone walk bridge on #2. We are installing a concrete walking surface and adding some additional stones to the top.

After pouring concrete around base poles


More Light Rain Overnight

With the light rain overnight (.16) and last few days rain showers cart are still off the path. The main reason for this has been the dry weather before and the rain has been light enough to soak into the ground. We have missed the heavy down pours that produce washed  out bunkers and standing water. So this morning the guys are mowing and raking bunkers.

Sunday, May 8, 2011

GREENS FAN PROJECT

It's been ten years in coming,and starting this Monday morning the fan installation project will start. Fan locations will be at the rear of #1, #2, #12, and #14.  The first phase will be the installation of mounting  posts in the ground, along with an electrical contractor installing power panels and lines. Duke Energy and Energy United will be running power to the panels. This phase will take about two to three weeks depending on the weather. The last phase will be mounting the fans, and connecting the power. The plan is to have the fans up and running by June 1st. The fans actually arrived this past Friday, two weeks ahead of the original scheduled delivery date.
50" Turf Breeze greens fans

Saturday, May 7, 2011

AUGIE'S FIRST YEAR



  I was reminder by a lot of people that Augie has not been in the Blog since his arrival last May.  So since he just turned a year old, here are are few pictures from over the past year.




first day at work 8 weeks

meeting Hammie the shop cat




play time


Nap time in the office


daily morning run to check the course






move up to chair for nap time



big enough to get his own drink










today 5-7


GREENS AERATION RECOVERY

Greens are healing very nicely and really benefited from the 1.07" rain we had Tuesday night. We will be topdressing some more this coming Monday to fill some open holes.
Greens last Saturday 4-30
Greens this Saturday 5-7

Thursday, May 5, 2011

LAST WEEKS GREENS AERATION



Emmanuel and Humberto starting on #1
 
The greens are starting to recover from last weeks aeration. Which went fairly well with only a few minor equipment issues and getting my new assistant Martin Pugh up to speed on the course and crew. Here is the series of events on Tuesday and Wednesday last week. 

Marty and crew picking up plugs on #14






Jr topdressing



Chris blowing sand in holes





Watering in sand after rolling on Friday 4-29